| Shropshire Suzuki http://www.shropshire-suzuki.co.uk/forum/ |
|
| I spent Sunday doing some work on Snowy for the............. http://www.shropshire-suzuki.co.uk/forum/viewtopic.php?f=15&t=6610 |
Page 1 of 3 |
| Author: | sae70 [ Tue Feb 17, 2009 12:42 am ] |
| Post subject: | I spent Sunday doing some work on Snowy for the............. |
first time in 4 months and it was great I love the smell of grease in the morning and black dirt under me finger nails Small steps but was great to spend some time playing Repaired an earth fault with the front N/S side light and turn signal I don't think that this is the cause of my ongoing battery drain Blanked the suspension turret tops with the tufftub cut outs that I removed from Shaky, glued on with Tiger seal Attachment: P1010057.JPG Fitted a new latch to my top glove box Attachment: P1010058.JPG Permanently mounted me fire extinguisher and towing electrics Attachment: P1010049.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 1:39 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Replaced the door cards having removed them to fit the central locking that I had removed from Shaky ![]() Attachment: P9150015.JPG Attachment: P1010051.JPG Attachment: P1010052.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 1:48 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Fitted new window winder handles to the drivers and passengers doors Attachment: P1010061.JPG Attachment: P1010061.JPG And a new internal door handle to the drivers door as the original was broken Attachment: P1010060.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 1:59 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Refited the back door card and load space side cards after running the wiring for the work light mounted on the back door, sorry no photo of the work light Attachment: P1010072.JPG Attachment: P9050006.JPG Attachment: P1010050.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 2:07 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Then jacked her up and got the front wheels off Attachment: P1010022copy.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 2:22 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Got her jacked up so I could remove the dust guards from off the back of the front discs and fit the Aisin free wheeling hubs that I removed from Shaky I removed alot of bits from Shaky ![]() Attachment: P8270058.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 2:29 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Anyway I'll let these photo do the rest of the talking as I'm strugglin to type with Eliza on my lap and a bottle of milk in one hand Attachment: P1010026.JPG Attachment: P1010029.JPG Attachment: P1010032.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 2:32 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Attachment: P1010033.JPG Attachment: P1010034.JPG Attachment: P1010035.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 2:39 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Attachment: P1010036.JPG Attachment: P1010037.JPG Attachment: P1010038.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 2:43 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Attachment: P1010039.JPG Attachment: P1010040.JPG Attachment: P1010041.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 2:53 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Attachment: P1010042.JPG Attachment: P1010043.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 2:56 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Attachment: P1010044.JPG Attachment: P1010045.JPG Attachment: P1010046.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 3:01 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Attachment: P1010047.JPG Attachment: P1010048.JPG Attachment: P1010062.JPG |
|
| Author: | sae70 [ Tue Feb 17, 2009 3:05 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Attachment: P1010065.JPG Attachment: P1010067.JPG |
|
| Author: | Wilky [ Tue Feb 17, 2009 4:22 am ] |
| Post subject: | Re: I spent Sunday doing some work on Snowy for the............. |
Excellent pictorial, wish I could be bothered to take my time and take pics when I'm working on mine, major shortage of patience with anything gadgety, if my mobile rings when it's in close proximity to a heavy tool it's in grave danger of a thwack. Am I asking an obvious question now, but why remove the dustshields. |
|
| Page 1 of 3 | All times are UTC [ DST ] |
| Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group http://www.phpbb.com/ |
|